Service 04
Inspection & Testing
Material verification, third-party and NDT inspection coordination, pressure testing and condition monitoring — so equipment is proven before it goes into service.
Overview
Inspection is the step that turns material into material you can trust. We verify every delivery against its documentation, arrange independent inspection where your specification calls for it, and test equipment before it ships or returns to service.
What’s included
- Receiving inspection — markings, dimensions, quantities and heat numbers against the PO and MTRs
- Third-party and source inspection at mills and manufacturers
- NDT coordination — UT, RT, MT, PT and PMI through qualified inspection agencies
- OCTG and line-pipe inspection — drift, EMI, thread inspection
- Hydrostatic, pneumatic and seat testing of valves and assemblies
- Pipeline and facility condition surveys
- Condition monitoring of rotating and HVAC equipment
Standards & grades
Supplied to the governing standard.
| Standard | Scope | Grades / classes |
|---|---|---|
| API RP 5A5 | Field inspection of new casing, tubing and plain-end drill pipe | EMI, drift, end-area |
| ASME Section V | Nondestructive examination methods | UT, RT, MT, PT |
| API 598 | Valve inspection and testing | Shell, seat, backseat |
| API 570 / 510 | In-service piping and pressure vessel inspection | Through certified inspectors |
Typical applications
- Pre-shipment and pre-installation checks
- Supplier qualification and source inspection
- Turnaround and shutdown inspection scopes
- Integrity assessments of ageing facilities
Documentation provided
- Inspection and test plans (ITPs)
- NDT and PMI reports
- Hydrotest charts and certificates
- Dimensional and visual inspection reports
- Release notes and non-conformance reports
Related projects
Inspection & Testing in the field.
Processing plant operator · Houston Ship Channel, TX
MRO supply programme for a Gulf Coast processing plant
Hundreds of maintenance spares and consumables consolidated from many vendors into one inspected, documented supply programme.
International E&P operator · Houston → West Africa
Export procurement package for a West African operator
Consolidated multi-vendor material, export-packed and shipped breakbulk from the Port of Houston.
1st time
Customs clearance
FAQ
Questions buyers ask us.
Request for quotation
Need help with inspection & testing?
Upload your material take-off, drawing or line list. We quote line by line with lead times — usually within 24 hours.

