The challenge

A gathering expansion had to tie in six new pads on a construction schedule set by first production. The MTO had several spec conflicts between the piping class and the valve datasheets.

Our scope

  • MTO review — flagged line-item conflicts before purchase
  • Supplied API 5L X52 PSL2 line pipe, B16.9 fittings and B16.5 flanges
  • Expedited API 6D trunnion ball valves against the critical path
  • Delivered in phased loads matched to the construction sequence

The result

All six tie-ins supplied on schedule with a single indexed documentation package.