The challenge
A gathering expansion had to tie in six new pads on a construction schedule set by first production. The MTO had several spec conflicts between the piping class and the valve datasheets.
Our scope
- MTO review — flagged line-item conflicts before purchase
- Supplied API 5L X52 PSL2 line pipe, B16.9 fittings and B16.5 flanges
- Expedited API 6D trunnion ball valves against the critical path
- Delivered in phased loads matched to the construction sequence
The result
All six tie-ins supplied on schedule with a single indexed documentation package.