Valve, choke and pump overhaul at a production flow station

Overhaul of manifold valves, production chokes and transfer pumps during a planned shutdown, with crews, cranes and spares supplied.

Client
Production operator
Location
Eagle Ford, TX
Industry
Oil & Gas Production

The challenge

A flow station with recurring choke erosion and pump seal failures had a short planned shutdown to put it right. The work needed parts, lifting equipment and extra technicians at the same time.

Our scope

  • Supplied replacement chokes with upgraded trims and re-tested manifold valves
  • Overhauled transfer pumps and replaced mechanical seals
  • Rented a crane and manlifts with certified operators for the shutdown
  • Placed additional valve and pump technicians for the outage

The result

All work completed inside the shutdown window, with test certificates for every valve and choke.

Gallery

Request for quotation

Have an MTO? Send it.

Upload your material take-off, drawing or line list. We quote line by line with lead times — usually within 24 hours.