Composite wrap repair on a 12-inch gas gathering line

Engineered composite repair of external corrosion, restoring MAOP without a shutdown or cut-out.

Client
Midstream operator
Location
Brazoria County, TX
Industry
Midstream Pipelines

The challenge

An integrity dig found external corrosion on a 12-inch gas gathering line close to a road crossing. A cut-out would have meant a shutdown, purging and a new crossing permit.

Our scope

  • Assessed the defects and designed the repair to ASME PCC-2
  • Prepared the surface and installed the composite wrap system under live conditions
  • Surveyed the cathodic protection system and corrected under-protected sections
  • Issued repair records and calculations for the operator’s integrity file

The result

Line restored to its maximum allowable operating pressure with no interruption to throughput.